|
|
The home stretch as the crew gets ready to hit the road. Final test of fans working, poured cement for the doorway, planting beds finished
(the outer row), Tom fills in the outer blue board outside trim with rock for insulation, Todd bolts down the foundation, and everything
looks great. The water tank is filling with 3,000 gallons of water, and away they go into the sunset. Its so quiet inside the
dome, and sound reflects everywhere. On night one, I measured the temperature inside the water tank, inside the dome, and outside in the
fresh air using a Oregon Scientific Weather station. Outside, 32 -- Water temp, 64 -- Dome temp, 52
|